Sep 2016 "Steam Condensate Reuse Case Studies"

  • 12 Sep 2016
  • 11:30 AM - 1:30 PM (CDT)
  • Crown Plaza Kansas City - Overland Park

Registration

  • Eight for Six Program - Get eight lunches for the price of six for $150.00. Requires Annual Prepayment for the entire year online through PayPal or at the door September Meeting only. $25.00 x 6 = $150.00.
  • Please register on your website www.kc-apse.com
  • For On-line prepayment
  • REQUIRES PREREGISTRATION ONLINE $25.00 per person payment by cash or check at the door.
  • A great opportunity to support Student Night and help defray the costs!
  • If you register as a student, check the name of your school in the registration form and please show up.
  • Walk-Ins are always welcome. For those who do not preregister prior to the cut-off date.

Registration is closed
September 2016
  

Discounted, Online Registration is open until Friday, September 9.
(Weren't able to preregister? Don't let that stop you. Walk-ins are welcome, luncheon is $30)
   

WE MOVED LOCATIONS!

Crown Plaza Kansas City - Overland Park  

 

    Kelley Cramm 

 Henderson Engineers Inc.

 Kelley is a mechanical engineer with over 30 years of experience in HVAC, plumbing and piping systems.  She has spent much of her career working on complex, technically challenging projects.  She has been active in ASHRAE throughout her career.  She is past chair of Technical Committee 9.1 Large Building Air Conditioning Systems and Serves on the ASHRAE Technical Activities Committee and Handbook Committee.  Kelley served as president of the KC Chapter in 1992-1993.

Stuart Braden

 W.L. Cassell & Associates

 Stuart graduated with an Architectural Engineering degree from Kansas State University in 1985 and has worked at W.L. Cassell & Associates since graduation and is now Vice President of the firm.  He has had the opportunity to be involved with the design of the Richard Bolling Federal Building renovation, the Kaufmann Center of Performing Arts, The National World War I Museum and many more.  Stuart served as president of the KC Chapter in 2009-2010.

 

Topic of Discussion

 

Steam Condensate and Storm Water Recovery for the Richard Bolling Federal Building

 

The Richard Bolling Building was constructed in the early 1960s. The 20 story building at around 1.2 million square feet is one of the largest buildings in Kansas City. We began design of the 4 phase complete renovation of the building in 2001. Construction of the 4th phase was just completed this year. The renovation included complete asbestos abatement and a complete gut of the interior. What made this project difficult was the fact the building was fully occupied during construction and the floors were not necessarily remodeled in consecutive order. The Phase IV of the project is currently up for LEED Silver certification and may reach gold. Two items that were used to achieve this goal were utilizing waste steam condensate to provide a heating source for their existing snow melt system and 2 very large cisterns to capture 100% of the storm water and AHU condensate drainage for storm water management and site irrigation.

 

      Please RSVP at www.kcashrae.org by Friday, September 9th @ End of Day.
      


Fees are $25 for those who RSVP by deadline and $30.00 at the door.
 

WE MOVED LOCATIONS!

Directions to Crown Plaza Kansas City - Overland Park

12601 W. 95th St., Lenexa Kansas 66215 
     
Hotel Front Desk: 913-217-1000
        
     

       
          
Hope to see everyone at this month’s lunch program!
© ASHRAE - Kansas City Chapter
Powered by Wild Apricot Membership Software